2006 to 2020
CCL drilled the first hole at Fire Lake in 2006, when the mine reopened. Initially, the contract involved carrying out different types of drilling, including production drilling, pre-split drilling, rock drilling, redrilling and blasting. The CCL team worked closely with the engineering team to follow their progress plan. The mandate evolved over the years as ArcelorMittal acquired its own drilling equipment. CCL has always been present to support operations, notably with water trucks and diesel trucks, for secondary drilling (pre-split drilling, rock drilling, redrilling, etc.) as well as blasting.