June 1994 to December 2025
The secondary drilling project at ArcelorMittal’s Mont-Wright mine includes all drilling activities supporting the mine’s production drilling operations. This includes, but is not limited to, pre-split drilling, redrilling and correction of blasting anomalies, mine development and rock drilling. The project is characterized by the use of long casings. We have all the auxiliary equipment required for this project, including water tanks, heavy-haul trucks, water trucks and boom trucks, allowing us to remain 100% autonomous in our operations. We have been operating autonomously on this project for more than 30 years.