2017 – 2019
In 2017, CCL Drill and Blast obtained the mandate to perform drilling and blasting for North American Lithium. CCL was therefore responsible for production drilling, secondary drilling (precut, rock, casing, etc.), blasting the entire project and supplying explosives. Efficient teamwork with the engineering department allowed to proceed smoothly despite the technical challenges the project presented.